Foundation works continue at DiONE
April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds of cubic meters of soil from the construction site. In the coming weeks all excavation works should be finished and we would move to the next stage – foundation and basement works. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds of cubic meters of soil from the construction site. In the coming weeks all excavation works should be finished and we would move to the next stage – foundation and basement works. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due… Read more DIO Residence completion schedule for June 2019 April 28, 2019 April 28, 2019 DIO RESIDENCE COMPLETION SCHEDULE FOR JUNE 2019 DIO Residence should rightfully become an ornament of Tourist Area in Limassol. The project is 90% complete and is scheduled for delivery in June. In the coming months, BCL PRO plans to complete all façade works, finish polishing the interior, wrap up with landscaping, swimming pool, pergola and spa. The first inhabitants of DIO Residence are projected to settle by the end of June. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect,… Read more Spa area of DIO Residence September 1, 2019 September 1, 2019 SPA AREA OF DIO RESIDENCE Two families already happily live at DIO Residence and are happy to use comfortable sauna and steam bath. We have received positive feedback and hope to maintain high standard of quality in every possible way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks… Read more Works continue at DiONE September 25, 2019 September 25, 2019 WORKS CONTINUE AT DIONE A summary of works that have been done to date at DiONE construction site: Foundation slab – completedBasement slab – completed During the first week of October 2019 pouring of concrete should be carried by the general contractor at the ground floor and mid of October 2019 the framework of the ground floor should be completed. By the end of October 2019 the first floor slab should be set and works progress to creating the columns and beams. We remain in the set schedule and aim to deliver DiONE ready by the end… Read more Concrete frame of DiONE is completed. August 5, 2020 August 05, 2020 CONCRETE FRAME OF DIONE IS COMPLETED We are glad to announce that Covid-19 lockdown has not affected our schedule by much and we have just completed the concrete frame of the building. Please stay tuned in for updates. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds… Read more Internal works at DiONE. September 15, 2020 September 15, 2020 INTERNAL WORKS AT DIONE We are continuing internal works at DiONE. At the moment we are all mechanical installations, e.g. water floor heating and sanitary provisions, and already works for ceilings and floors are being done. We aim to start installing tiles by the end of October. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery… Read more Works continue amid new lockdown rumours November 10, 2020 November 10, 2020 WORKS CONTINUE AMID NEW LOCKDOWN RUMOURS We are working full speed to deliver the building in June 2020. At the moment we are on schedule and we aim to start installing aluminium windows by the end of November. 1st and 2nd floor kitchens and doors are to be delivered and installed immediately after the first windows are fitted. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage… Read more Brand new website and presentation materials on the way. November 17, 2020 November 17, 2020 BRAND NEW WEBSITE AND PRESENTATION MATERIALS ON THE WAY We are finish updating our website with brand new design and functionality. Feel free to browse and specifically check our DiONE project page available at https://bcl-pro.com/dione-residence/. New brochure and material presentation are on their way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth.… Read more The completion of DiONE Residence April 20, 2023 May 20, 2022 The completion of DiONE Residence We are thrilled to announce the completion of DiONE Residence, a stunning new residential…