DiArte Hills – a high-class project. Set to Commence Construction Next Year!

November 17, 2023 DiArte Hills – a high-class project. Set to Commence Construction Next Year! Get ready for the launch of our newest project, DiArte Hills, nestled in the heart of Mouttagiaka in Limassol. This exclusive visionary project comprising eight spacious villas offering a choice between 3 & 4 bedrooms, each designed to embrace unobstructed panoramic views of the Mediterranean Sea.   The area of Mouttagiaka is a highly esteemed and tranquil neighbourhood, offering proximity to the beach, effortless highway access, and convenient reach to various amenities like supermarkets, restaurants, pharmacies, and more.   At DiArte Hills, expect a lifestyle beyond compare. Each villa comes complete with a swimming pool, meticulously landscaped gardens, and the modern architectural design, coupled with the use of high-quality materials, ensures both aesthetics and durability.   Stay tuned for more updates as we bring DiArte Hills to life. Experience the fusion of luxury, innovation, and breathtaking views in Limassol. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds of cubic meters of soil from the construction site. In the coming weeks all excavation works should be finished and we would move to the next stage – foundation and basement works. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due… Read more DIO Residence completion schedule for June 2019 April 28, 2019 April 28, 2019 DIO RESIDENCE COMPLETION SCHEDULE FOR JUNE 2019 DIO Residence should rightfully become an ornament of Tourist Area in Limassol. The project is 90% complete and is scheduled for delivery in June. In the coming months, BCL PRO plans to complete all façade works, finish polishing the interior, wrap up with landscaping, swimming pool, pergola and spa. The first inhabitants of DIO Residence are projected to settle by the end of June. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect,… Read more Spa area of DIO Residence September 1, 2019 September 1, 2019 SPA AREA OF DIO RESIDENCE Two families already happily live at DIO Residence and are happy to use comfortable sauna and steam bath. We have received positive feedback and hope to maintain high standard of quality in every possible way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks… Read more Works continue at DiONE September 25, 2019 September 25, 2019 WORKS CONTINUE AT DIONE A summary of works that have been done to date at DiONE construction site: Foundation slab – completedBasement slab – completed During the first week of October 2019 pouring of concrete should be carried by the general contractor at the ground floor and mid of October 2019 the framework of the ground floor should be completed. By the end of October 2019 the first floor slab should be set and works progress to creating the columns and beams. We remain in the set schedule and aim to deliver DiONE ready by the end… Read more Concrete frame of DiONE is completed. August 5, 2020 August 05, 2020 CONCRETE FRAME OF DIONE IS COMPLETED We are glad to announce that Covid-19 lockdown has not affected our schedule by much and we have just completed the concrete frame of the building. Please stay tuned in for updates. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds… Read more Internal works at DiONE. September 15, 2020 September 15, 2020 INTERNAL WORKS AT DIONE We are continuing internal works at DiONE. At the moment we are all mechanical installations, e.g. water floor heating and sanitary provisions, and already works for ceilings and floors are being done. We aim to start installing tiles by the end of October. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery… Read more Works continue amid new lockdown rumours November 10, 2020 November 10, 2020 WORKS CONTINUE AMID NEW LOCKDOWN RUMOURS We are working full speed to deliver the building in June 2020. At the moment we are on schedule and we aim to start installing aluminium windows by the end of November. 1st and 2nd floor kitchens and doors are to be delivered and installed immediately after the first windows are fitted. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage… Read more Brand new website and presentation materials on the way. November 17, 2020 November 17, 2020 BRAND NEW WEBSITE AND PRESENTATION MATERIALS ON THE WAY We are finish updating our website with brand new design and functionality. Feel free to browse and specifically check our DiONE project page available at https://bcl-pro.com/dione-residence/. New brochure and material presentation are on their way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April…

601 PENTHOUSE

A stunning turn-key finishing to one of our penthouses

January 30, 2023 A stunning turn-key finishing to one of our penthouses We are pleased to announce that one of our penthouses at our luxury complex DiONE Residence has undergone a stunning turn-key finishing, featuring exclusive Italian furniture from famous Italian brands Biba Salotti and Midj. In addition to the furniture, the penthouse has been equipped with top-of-the-line sanitary fixtures from Alice Ceramics, as well as Miele and Bugatti designed kitchen appliances, ready to welcome prospective client for immediate move-in.   The outdoor space has also been transformed into a breathtaking oasis, furnished by exclusive Penelope-style outdoor furniture design supplied by the Italian brand MyYour. Residents can now enjoy their meals on the terrace with breathtaking views, surrounded by comfortable and stylish furniture.   With the completion of the turn-key finishing, this penthouse at the 6-th floor is now a truly luxurious and comfortable living space, perfect for those seeking the best of the best in residential living. The penthouse offers stunning views, high-end finishes, exclusive furniture and a range of luxurious amenities, including a rooftop jacuzzi, outdoor kitchen, sauna and top-roof patio.   We invite you to come and experience the finished penthouse and all it has to offer. Contact us today to schedule a tour and see this exceptional living space for yourself. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds of cubic meters of soil from the construction site. In the coming weeks all excavation works should be finished and we would move to the next stage – foundation and basement works. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due… Read more DIO Residence completion schedule for June 2019 April 28, 2019 April 28, 2019 DIO RESIDENCE COMPLETION SCHEDULE FOR JUNE 2019 DIO Residence should rightfully become an ornament of Tourist Area in Limassol. The project is 90% complete and is scheduled for delivery in June. In the coming months, BCL PRO plans to complete all façade works, finish polishing the interior, wrap up with landscaping, swimming pool, pergola and spa. The first inhabitants of DIO Residence are projected to settle by the end of June. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect,… Read more Spa area of DIO Residence September 1, 2019 September 1, 2019 SPA AREA OF DIO RESIDENCE Two families already happily live at DIO Residence and are happy to use comfortable sauna and steam bath. We have received positive feedback and hope to maintain high standard of quality in every possible way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks… Read more Works continue at DiONE September 25, 2019 September 25, 2019 WORKS CONTINUE AT DIONE A summary of works that have been done to date at DiONE construction site: Foundation slab – completedBasement slab – completed During the first week of October 2019 pouring of concrete should be carried by the general contractor at the ground floor and mid of October 2019 the framework of the ground floor should be completed. By the end of October 2019 the first floor slab should be set and works progress to creating the columns and beams. We remain in the set schedule and aim to deliver DiONE ready by the end… Read more Concrete frame of DiONE is completed. August 5, 2020 August 05, 2020 CONCRETE FRAME OF DIONE IS COMPLETED We are glad to announce that Covid-19 lockdown has not affected our schedule by much and we have just completed the concrete frame of the building. Please stay tuned in for updates. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds… Read more Internal works at DiONE. September 15, 2020 September 15, 2020 INTERNAL WORKS AT DIONE We are continuing internal works at DiONE. At the moment we are all mechanical installations, e.g. water floor heating and sanitary provisions, and already works for ceilings and floors are being done. We aim to start installing tiles by the end of October. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery… Read more Works continue amid new lockdown rumours November 10, 2020 November 10, 2020 WORKS CONTINUE AMID NEW LOCKDOWN RUMOURS We are working full speed to deliver the building in June 2020. At the moment we are on schedule and we aim to start installing aluminium windows by the end of November. 1st and 2nd floor kitchens and doors are to be delivered and installed immediately after the first windows are fitted. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage… Read more Brand new website and presentation materials on the way.…

The completion of DiONE Residence

May 20, 2022 The completion of DiONE Residence We are thrilled to announce the completion of DiONE Residence, a stunning new residential complex located in the most prestigious area of Limassol city, Agios Tychonas District. The construction of DiONE Residence was completed on 20th of May of 2022, and the building is now ready to welcome its residents.   This modern and elegant complex features a range of luxurious amenities, including a Olympic size swimming pool, fitness court, a rooftop garden with breathtaking views, a SPA with Steam and Dry saunas, underground parking and a spacious outdoor BBQ area. The building also boasts a 24-hour concierge service, ensuring that residents receive the highest level of service and security.   DiONE Residence offers a range of spacious and beautifully designed, from cozy one-bedroom apartment to a double-floors penthouses, each featuring high-end finishes and top-of-the-line appliances. With its prime location in the touristic area of the city and only in 200 meters of distance from the sea beach, residents can also enjoy easy access to a wide variety of dining, shopping, and entertainment options.   We are excited to offer this exceptional living experience to our residents, and we look forward to seeing the DiONE Residence community thrive. Contact us today to learn more about this amazing new property and schedule a tour. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds of cubic meters of soil from the construction site. In the coming weeks all excavation works should be finished and we would move to the next stage – foundation and basement works. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due… Read more DIO Residence completion schedule for June 2019 April 28, 2019 April 28, 2019 DIO RESIDENCE COMPLETION SCHEDULE FOR JUNE 2019 DIO Residence should rightfully become an ornament of Tourist Area in Limassol. The project is 90% complete and is scheduled for delivery in June. In the coming months, BCL PRO plans to complete all façade works, finish polishing the interior, wrap up with landscaping, swimming pool, pergola and spa. The first inhabitants of DIO Residence are projected to settle by the end of June. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect,… Read more Spa area of DIO Residence September 1, 2019 September 1, 2019 SPA AREA OF DIO RESIDENCE Two families already happily live at DIO Residence and are happy to use comfortable sauna and steam bath. We have received positive feedback and hope to maintain high standard of quality in every possible way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks… Read more Works continue at DiONE September 25, 2019 September 25, 2019 WORKS CONTINUE AT DIONE A summary of works that have been done to date at DiONE construction site: Foundation slab – completedBasement slab – completed During the first week of October 2019 pouring of concrete should be carried by the general contractor at the ground floor and mid of October 2019 the framework of the ground floor should be completed. By the end of October 2019 the first floor slab should be set and works progress to creating the columns and beams. We remain in the set schedule and aim to deliver DiONE ready by the end… Read more Concrete frame of DiONE is completed. August 5, 2020 August 05, 2020 CONCRETE FRAME OF DIONE IS COMPLETED We are glad to announce that Covid-19 lockdown has not affected our schedule by much and we have just completed the concrete frame of the building. Please stay tuned in for updates. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds… Read more Internal works at DiONE. September 15, 2020 September 15, 2020 INTERNAL WORKS AT DIONE We are continuing internal works at DiONE. At the moment we are all mechanical installations, e.g. water floor heating and sanitary provisions, and already works for ceilings and floors are being done. We aim to start installing tiles by the end of October. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery… Read more Works continue amid new lockdown rumours November 10, 2020 November 10, 2020 WORKS CONTINUE AMID NEW LOCKDOWN RUMOURS We are working full speed to deliver the building in June 2020. At the moment we are on schedule and we aim to start installing aluminium windows by the end of November. 1st and 2nd floor kitchens and doors are to be delivered and installed immediately after the first windows are fitted. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage… Read more Brand new website…

DiONE LIMASSOL

Brand new website and presentation materials on the way.

November 17, 2020 BRAND NEW WEBSITE AND PRESENTATION MATERIALS ON THE WAY We are finish updating our website with brand new design and functionality. Feel free to browse and specifically check our DiONE project page available at https://bcl-pro.com/dione-residence/. New brochure and material presentation are on their way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds of cubic meters of soil from the construction site. In the coming weeks all excavation works should be finished and we would move to the next stage – foundation and basement works. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due… Read more DIO Residence completion schedule for June 2019 April 28, 2019 April 28, 2019 DIO RESIDENCE COMPLETION SCHEDULE FOR JUNE 2019 DIO Residence should rightfully become an ornament of Tourist Area in Limassol. The project is 90% complete and is scheduled for delivery in June. In the coming months, BCL PRO plans to complete all façade works, finish polishing the interior, wrap up with landscaping, swimming pool, pergola and spa. The first inhabitants of DIO Residence are projected to settle by the end of June. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect,… Read more Spa area of DIO Residence September 1, 2019 September 1, 2019 SPA AREA OF DIO RESIDENCE Two families already happily live at DIO Residence and are happy to use comfortable sauna and steam bath. We have received positive feedback and hope to maintain high standard of quality in every possible way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks… Read more Works continue at DiONE September 25, 2019 September 25, 2019 WORKS CONTINUE AT DIONE A summary of works that have been done to date at DiONE construction site: Foundation slab – completedBasement slab – completed During the first week of October 2019 pouring of concrete should be carried by the general contractor at the ground floor and mid of October 2019 the framework of the ground floor should be completed. By the end of October 2019 the first floor slab should be set and works progress to creating the columns and beams. We remain in the set schedule and aim to deliver DiONE ready by the end… Read more Concrete frame of DiONE is completed. August 5, 2020 August 05, 2020 CONCRETE FRAME OF DIONE IS COMPLETED We are glad to announce that Covid-19 lockdown has not affected our schedule by much and we have just completed the concrete frame of the building. Please stay tuned in for updates. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds… Read more Internal works at DiONE. September 15, 2020 September 15, 2020 INTERNAL WORKS AT DIONE We are continuing internal works at DiONE. At the moment we are all mechanical installations, e.g. water floor heating and sanitary provisions, and already works for ceilings and floors are being done. We aim to start installing tiles by the end of October. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery… Read more Works continue amid new lockdown rumours November 10, 2020 November 10, 2020 WORKS CONTINUE AMID NEW LOCKDOWN RUMOURS We are working full speed to deliver the building in June 2020. At the moment we are on schedule and we aim to start installing aluminium windows by the end of November. 1st and 2nd floor kitchens and doors are to be delivered and installed immediately after the first windows are fitted. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage… Read more Brand new website and presentation materials on the way. November 17, 2020 November 17, 2020 BRAND NEW WEBSITE AND PRESENTATION MATERIALS ON THE WAY We are finish updating our website with brand new design and functionality. Feel free to browse and specifically check our DiONE project page available at https://bcl-pro.com/dione-residence/. New brochure and material presentation are on their way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth.… Read more The completion of DiONE Residence April 20, 2023 May 20, 2022 The completion of DiONE Residence We are thrilled to announce the completion of DiONE Residence, a stunning new residential complex located in the most prestigious area of Limassol city, Agios Tychonas District. The construction of DiONE Residence was completed on 20th of May of 2022, and the building is now ready to welcome…

DiONE BLOG

Works continue amid new lockdown rumours

November 10, 2020 WORKS CONTINUE AMID NEW LOCKDOWN RUMOURS We are working full speed to deliver the building in June 2020. At the moment we are on schedule and we aim to start installing aluminium windows by the end of November. 1st and 2nd floor kitchens and doors are to be delivered and installed immediately after the first windows are fitted. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds of cubic meters of soil from the construction site. In the coming weeks all excavation works should be finished and we would move to the next stage – foundation and basement works. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due… Read more DIO Residence completion schedule for June 2019 April 28, 2019 April 28, 2019 DIO RESIDENCE COMPLETION SCHEDULE FOR JUNE 2019 DIO Residence should rightfully become an ornament of Tourist Area in Limassol. The project is 90% complete and is scheduled for delivery in June. In the coming months, BCL PRO plans to complete all façade works, finish polishing the interior, wrap up with landscaping, swimming pool, pergola and spa. The first inhabitants of DIO Residence are projected to settle by the end of June. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect,… Read more Spa area of DIO Residence September 1, 2019 September 1, 2019 SPA AREA OF DIO RESIDENCE Two families already happily live at DIO Residence and are happy to use comfortable sauna and steam bath. We have received positive feedback and hope to maintain high standard of quality in every possible way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks… Read more Works continue at DiONE September 25, 2019 September 25, 2019 WORKS CONTINUE AT DIONE A summary of works that have been done to date at DiONE construction site: Foundation slab – completedBasement slab – completed During the first week of October 2019 pouring of concrete should be carried by the general contractor at the ground floor and mid of October 2019 the framework of the ground floor should be completed. By the end of October 2019 the first floor slab should be set and works progress to creating the columns and beams. We remain in the set schedule and aim to deliver DiONE ready by the end… Read more Concrete frame of DiONE is completed. August 5, 2020 August 05, 2020 CONCRETE FRAME OF DIONE IS COMPLETED We are glad to announce that Covid-19 lockdown has not affected our schedule by much and we have just completed the concrete frame of the building. Please stay tuned in for updates. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds… Read more Internal works at DiONE. September 15, 2020 September 15, 2020 INTERNAL WORKS AT DIONE We are continuing internal works at DiONE. At the moment we are all mechanical installations, e.g. water floor heating and sanitary provisions, and already works for ceilings and floors are being done. We aim to start installing tiles by the end of October. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery… Read more Works continue amid new lockdown rumours November 10, 2020 November 10, 2020 WORKS CONTINUE AMID NEW LOCKDOWN RUMOURS We are working full speed to deliver the building in June 2020. At the moment we are on schedule and we aim to start installing aluminium windows by the end of November. 1st and 2nd floor kitchens and doors are to be delivered and installed immediately after the first windows are fitted. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage… Read more Brand new website and presentation materials on the way. November 17, 2020 November 17, 2020 BRAND NEW WEBSITE AND PRESENTATION MATERIALS ON THE WAY We are finish updating our website with brand new design and functionality. Feel free to browse and specifically check our DiONE project page available at https://bcl-pro.com/dione-residence/. New brochure and material presentation are on their way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth.… Read more The completion of DiONE Residence April 20, 2023 May 20, 2022 The completion of DiONE Residence We are thrilled to announce the completion of DiONE Residence, a stunning new residential complex located in the most prestigious area of Limassol city, Agios Tychonas District. The construction of DiONE Residence was completed on…

DiONE BLOG

Internal works at DiONE.

September 15, 2020 INTERNAL WORKS AT DIONE We are continuing internal works at DiONE. At the moment we are all mechanical installations, e.g. water floor heating and sanitary provisions, and already works for ceilings and floors are being done. We aim to start installing tiles by the end of October. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds of cubic meters of soil from the construction site. In the coming weeks all excavation works should be finished and we would move to the next stage – foundation and basement works. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due… Read more DIO Residence completion schedule for June 2019 April 28, 2019 April 28, 2019 DIO RESIDENCE COMPLETION SCHEDULE FOR JUNE 2019 DIO Residence should rightfully become an ornament of Tourist Area in Limassol. The project is 90% complete and is scheduled for delivery in June. In the coming months, BCL PRO plans to complete all façade works, finish polishing the interior, wrap up with landscaping, swimming pool, pergola and spa. The first inhabitants of DIO Residence are projected to settle by the end of June. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect,… Read more Spa area of DIO Residence September 1, 2019 September 1, 2019 SPA AREA OF DIO RESIDENCE Two families already happily live at DIO Residence and are happy to use comfortable sauna and steam bath. We have received positive feedback and hope to maintain high standard of quality in every possible way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks… Read more Works continue at DiONE September 25, 2019 September 25, 2019 WORKS CONTINUE AT DIONE A summary of works that have been done to date at DiONE construction site: Foundation slab – completedBasement slab – completed During the first week of October 2019 pouring of concrete should be carried by the general contractor at the ground floor and mid of October 2019 the framework of the ground floor should be completed. By the end of October 2019 the first floor slab should be set and works progress to creating the columns and beams. We remain in the set schedule and aim to deliver DiONE ready by the end… Read more Concrete frame of DiONE is completed. August 5, 2020 August 05, 2020 CONCRETE FRAME OF DIONE IS COMPLETED We are glad to announce that Covid-19 lockdown has not affected our schedule by much and we have just completed the concrete frame of the building. Please stay tuned in for updates. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds… Read more Internal works at DiONE. September 15, 2020 September 15, 2020 INTERNAL WORKS AT DIONE We are continuing internal works at DiONE. At the moment we are all mechanical installations, e.g. water floor heating and sanitary provisions, and already works for ceilings and floors are being done. We aim to start installing tiles by the end of October. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery… Read more Works continue amid new lockdown rumours November 10, 2020 November 10, 2020 WORKS CONTINUE AMID NEW LOCKDOWN RUMOURS We are working full speed to deliver the building in June 2020. At the moment we are on schedule and we aim to start installing aluminium windows by the end of November. 1st and 2nd floor kitchens and doors are to be delivered and installed immediately after the first windows are fitted. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage… Read more Brand new website and presentation materials on the way. November 17, 2020 November 17, 2020 BRAND NEW WEBSITE AND PRESENTATION MATERIALS ON THE WAY We are finish updating our website with brand new design and functionality. Feel free to browse and specifically check our DiONE project page available at https://bcl-pro.com/dione-residence/. New brochure and material presentation are on their way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth.… Read more The completion of DiONE Residence April 20, 2023 May 20, 2022 The completion of DiONE Residence We are thrilled to announce the completion of DiONE Residence, a stunning new residential complex located in the most prestigious area of Limassol city, Agios Tychonas District. The construction of DiONE Residence was completed on 20th of May of 2022, and the building is…

Concrete frame of DiONE is completed.

August 05, 2020 CONCRETE FRAME OF DIONE IS COMPLETED We are glad to announce that Covid-19 lockdown has not affected our schedule by much and we have just completed the concrete frame of the building. Please stay tuned in for updates. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds of cubic meters of soil from the construction site. In the coming weeks all excavation works should be finished and we would move to the next stage – foundation and basement works. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due… Read more DIO Residence completion schedule for June 2019 April 28, 2019 April 28, 2019 DIO RESIDENCE COMPLETION SCHEDULE FOR JUNE 2019 DIO Residence should rightfully become an ornament of Tourist Area in Limassol. The project is 90% complete and is scheduled for delivery in June. In the coming months, BCL PRO plans to complete all façade works, finish polishing the interior, wrap up with landscaping, swimming pool, pergola and spa. The first inhabitants of DIO Residence are projected to settle by the end of June. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect,… Read more Spa area of DIO Residence September 1, 2019 September 1, 2019 SPA AREA OF DIO RESIDENCE Two families already happily live at DIO Residence and are happy to use comfortable sauna and steam bath. We have received positive feedback and hope to maintain high standard of quality in every possible way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks… Read more Works continue at DiONE September 25, 2019 September 25, 2019 WORKS CONTINUE AT DIONE A summary of works that have been done to date at DiONE construction site: Foundation slab – completedBasement slab – completed During the first week of October 2019 pouring of concrete should be carried by the general contractor at the ground floor and mid of October 2019 the framework of the ground floor should be completed. By the end of October 2019 the first floor slab should be set and works progress to creating the columns and beams. We remain in the set schedule and aim to deliver DiONE ready by the end… Read more Concrete frame of DiONE is completed. August 5, 2020 August 05, 2020 CONCRETE FRAME OF DIONE IS COMPLETED We are glad to announce that Covid-19 lockdown has not affected our schedule by much and we have just completed the concrete frame of the building. Please stay tuned in for updates. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds… Read more Internal works at DiONE. September 15, 2020 September 15, 2020 INTERNAL WORKS AT DIONE We are continuing internal works at DiONE. At the moment we are all mechanical installations, e.g. water floor heating and sanitary provisions, and already works for ceilings and floors are being done. We aim to start installing tiles by the end of October. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery… Read more Works continue amid new lockdown rumours November 10, 2020 November 10, 2020 WORKS CONTINUE AMID NEW LOCKDOWN RUMOURS We are working full speed to deliver the building in June 2020. At the moment we are on schedule and we aim to start installing aluminium windows by the end of November. 1st and 2nd floor kitchens and doors are to be delivered and installed immediately after the first windows are fitted. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage… Read more Brand new website and presentation materials on the way. November 17, 2020 November 17, 2020 BRAND NEW WEBSITE AND PRESENTATION MATERIALS ON THE WAY We are finish updating our website with brand new design and functionality. Feel free to browse and specifically check our DiONE project page available at https://bcl-pro.com/dione-residence/. New brochure and material presentation are on their way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth.… Read more The completion of DiONE Residence April 20, 2023 May 20, 2022 The completion of DiONE Residence We are thrilled to announce the completion of DiONE Residence, a stunning new residential complex located in the most prestigious area of Limassol city, Agios Tychonas District. The construction of DiONE Residence was completed on 20th of May of 2022, and the building is now ready to welcome its residents.   This modern…

Works continue at DiONE

September 25, 2019 WORKS CONTINUE AT DIONE A summary of works that have been done to date at DiONE construction site: Foundation slab – completedBasement slab – completed During the first week of October 2019 pouring of concrete should be carried by the general contractor at the ground floor and mid of October 2019 the framework of the ground floor should be completed. By the end of October 2019 the first floor slab should be set and works progress to creating the columns and beams. We remain in the set schedule and aim to deliver DiONE ready by the end of 2020. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds of cubic meters of soil from the construction site. In the coming weeks all excavation works should be finished and we would move to the next stage – foundation and basement works. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due… Read more DIO Residence completion schedule for June 2019 April 28, 2019 April 28, 2019 DIO RESIDENCE COMPLETION SCHEDULE FOR JUNE 2019 DIO Residence should rightfully become an ornament of Tourist Area in Limassol. The project is 90% complete and is scheduled for delivery in June. In the coming months, BCL PRO plans to complete all façade works, finish polishing the interior, wrap up with landscaping, swimming pool, pergola and spa. The first inhabitants of DIO Residence are projected to settle by the end of June. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect,… Read more Spa area of DIO Residence September 1, 2019 September 1, 2019 SPA AREA OF DIO RESIDENCE Two families already happily live at DIO Residence and are happy to use comfortable sauna and steam bath. We have received positive feedback and hope to maintain high standard of quality in every possible way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks… Read more Works continue at DiONE September 25, 2019 September 25, 2019 WORKS CONTINUE AT DIONE A summary of works that have been done to date at DiONE construction site: Foundation slab – completedBasement slab – completed During the first week of October 2019 pouring of concrete should be carried by the general contractor at the ground floor and mid of October 2019 the framework of the ground floor should be completed. By the end of October 2019 the first floor slab should be set and works progress to creating the columns and beams. We remain in the set schedule and aim to deliver DiONE ready by the end… Read more Concrete frame of DiONE is completed. August 5, 2020 August 05, 2020 CONCRETE FRAME OF DIONE IS COMPLETED We are glad to announce that Covid-19 lockdown has not affected our schedule by much and we have just completed the concrete frame of the building. Please stay tuned in for updates. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds… Read more Internal works at DiONE. September 15, 2020 September 15, 2020 INTERNAL WORKS AT DIONE We are continuing internal works at DiONE. At the moment we are all mechanical installations, e.g. water floor heating and sanitary provisions, and already works for ceilings and floors are being done. We aim to start installing tiles by the end of October. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery… Read more Works continue amid new lockdown rumours November 10, 2020 November 10, 2020 WORKS CONTINUE AMID NEW LOCKDOWN RUMOURS We are working full speed to deliver the building in June 2020. At the moment we are on schedule and we aim to start installing aluminium windows by the end of November. 1st and 2nd floor kitchens and doors are to be delivered and installed immediately after the first windows are fitted. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage… Read more Brand new website and presentation materials on the way. November 17, 2020 November 17, 2020 BRAND NEW WEBSITE AND PRESENTATION MATERIALS ON THE WAY We are finish updating our website with brand new design and functionality. Feel free to browse and specifically check our DiONE project page available at https://bcl-pro.com/dione-residence/. New brochure and material presentation are on their way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth.… Read more The completion of DiONE Residence April 20, 2023…

Spa area of DIO Residence

September 1, 2019 SPA AREA OF DIO RESIDENCE Two families already happily live at DIO Residence and are happy to use comfortable sauna and steam bath. We have received positive feedback and hope to maintain high standard of quality in every possible way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds of cubic meters of soil from the construction site. In the coming weeks all excavation works should be finished and we would move to the next stage – foundation and basement works. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due… Read more DIO Residence completion schedule for June 2019 April 28, 2019 April 28, 2019 DIO RESIDENCE COMPLETION SCHEDULE FOR JUNE 2019 DIO Residence should rightfully become an ornament of Tourist Area in Limassol. The project is 90% complete and is scheduled for delivery in June. In the coming months, BCL PRO plans to complete all façade works, finish polishing the interior, wrap up with landscaping, swimming pool, pergola and spa. The first inhabitants of DIO Residence are projected to settle by the end of June. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect,… Read more Spa area of DIO Residence September 1, 2019 September 1, 2019 SPA AREA OF DIO RESIDENCE Two families already happily live at DIO Residence and are happy to use comfortable sauna and steam bath. We have received positive feedback and hope to maintain high standard of quality in every possible way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks… Read more Works continue at DiONE September 25, 2019 September 25, 2019 WORKS CONTINUE AT DIONE A summary of works that have been done to date at DiONE construction site: Foundation slab – completedBasement slab – completed During the first week of October 2019 pouring of concrete should be carried by the general contractor at the ground floor and mid of October 2019 the framework of the ground floor should be completed. By the end of October 2019 the first floor slab should be set and works progress to creating the columns and beams. We remain in the set schedule and aim to deliver DiONE ready by the end… Read more Concrete frame of DiONE is completed. August 5, 2020 August 05, 2020 CONCRETE FRAME OF DIONE IS COMPLETED We are glad to announce that Covid-19 lockdown has not affected our schedule by much and we have just completed the concrete frame of the building. Please stay tuned in for updates. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth. Every day trucks remove hundreds… Read more Internal works at DiONE. September 15, 2020 September 15, 2020 INTERNAL WORKS AT DIONE We are continuing internal works at DiONE. At the moment we are all mechanical installations, e.g. water floor heating and sanitary provisions, and already works for ceilings and floors are being done. We aim to start installing tiles by the end of October. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery… Read more Works continue amid new lockdown rumours November 10, 2020 November 10, 2020 WORKS CONTINUE AMID NEW LOCKDOWN RUMOURS We are working full speed to deliver the building in June 2020. At the moment we are on schedule and we aim to start installing aluminium windows by the end of November. 1st and 2nd floor kitchens and doors are to be delivered and installed immediately after the first windows are fitted. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage… Read more Brand new website and presentation materials on the way. November 17, 2020 November 17, 2020 BRAND NEW WEBSITE AND PRESENTATION MATERIALS ON THE WAY We are finish updating our website with brand new design and functionality. Feel free to browse and specifically check our DiONE project page available at https://bcl-pro.com/dione-residence/. New brochure and material presentation are on their way. BLOGS SIMILAR ARTICLES Foundation works continue at DiONE April 20, 2019 April 20, 2019 FOUNDATION WORKS CONTINUE AT DIONE Due to well-coordinated work of the architect, engineers, topographers and the general contractor, BCL PRO managed to begin the initial construction stage – excavation of the pit. Right now the machinery reached the required depth.… Read more The completion of DiONE Residence April 20, 2023 May 20, 2022 The completion of DiONE Residence We are thrilled to announce the completion of DiONE Residence, a stunning new residential complex located in the most prestigious area of Limassol city, Agios Tychonas District. The construction of DiONE Residence was completed on 20th of May of 2022, and the building is now ready to welcome its residents.  …